{"schemaVersion":"export-constraint-regimes-v1","methodVersion":"export-constraint-register-v1","generatedAt":"2026-08-09T09:40:53.809Z","serving":"live-register","reviewedThrough":"2026-08-01","summary":{"regimeCount":8,"networkCount":7,"jurisdictionCount":4,"dynamicCount":7,"limitedRolloutCount":3,"sourcesCurrent":5,"sourcesNeedingReview":1},"methodology":{"schemaVersion":"export-constraint-regimes-v1","methodVersion":"export-constraint-register-v1","coverage":"Direct-source Australian fixed, flexible and dynamic connection regimes that cleared an exact-scope review. Absence from the register does not imply unrestricted export.","comparison":"Maximum values are compared only within the declared limit basis and customer class. A per-phase ceiling is not converted into a site value without phase configuration.","changeRule":"The monthly monitor detects source-page changes but does not rewrite a regime automatically. A changed source enters review-required state until a dated human review publishes the event.","missing":"A blank limit means the source makes the value connection-specific or does not publish a single defensible figure."},"regimes":[{"regimeKey":"au-qld-energex-dynamic-upto-30kva","networkCode":"ENERGEX","networkName":"Energex","jurisdictionCode":"AU-QLD","jurisdictionName":"Queensland","marketCode":"NEM-QLD1","connectionClass":"Homes and small businesses with DER up to 30 kVA","regimeType":"dynamic","status":"active","availability":"Negotiated connection option, subject to application, registration and commissioning.","effectiveFrom":null,"effectiveTo":null,"minimumExportKw":1.5,"maximumExportKw":10,"staticFallbackKw":1.5,"limitBasis":"per-phase","emergencyOverride":true,"communicationsStandard":"Internet-connected dynamic connection provider","equipmentRequirement":"Approved dynamic connection equipment, registration and on-site commissioning.","eligibility":"New or upgraded DER systems up to 30 kVA; network assessment and a negotiated offer apply.","decisionNote":"The normal minimum and maximum can be overridden during a significant emergency. The application fee and equipment cost remain separate inputs.","sourceKey":"energex-dynamic-connections","sourceLabel":"Energex Dynamic Connections","sourceVersion":"source checked 2026-08-01","sourceLocator":"Homeowners and small business: commissioning, minimum export, system size and communications fallback","dataSource":"Energex","dataVersion":"export-constraint-register-2026-08-01","dataConfidence":"High","evidenceUrl":"https://www.energex.com.au/our-services/connections/residential-and-commercial-connections/solar-connections-and-other-technologies/dynamic-connections-for-energy-exports/homeowners-and-small-business","retrievedAt":"2026-08-01T00:00:00+00:00"},{"regimeKey":"au-qld-ergon-dynamic-upto-30kva","networkCode":"ERGON","networkName":"Ergon Energy Network","jurisdictionCode":"AU-QLD","jurisdictionName":"Queensland","marketCode":"NEM-QLD1","connectionClass":"Homes and small businesses with DER up to 30 kVA","regimeType":"dynamic","status":"active","availability":"Negotiated connection option across eligible regional network locations.","effectiveFrom":null,"effectiveTo":null,"minimumExportKw":1.5,"maximumExportKw":10,"staticFallbackKw":1.5,"limitBasis":"per-phase","emergencyOverride":true,"communicationsStandard":"SEP2 / IEEE 2030.5 dynamic operating envelope","equipmentRequirement":"Compatible inverter or gateway and maintained internet communications.","eligibility":"New or upgraded DER systems up to 30 kVA; negotiated connection and network approval apply.","decisionNote":"Regional single-wire basic connections have a different static comparison basis. The dynamic ceiling is not guaranteed at every interval.","sourceKey":"ergon-dynamic-connections","sourceLabel":"Ergon Energy Network Dynamic Connections","sourceVersion":"source checked 2026-08-01","sourceLocator":"About Dynamic Connections: operating envelope, connection class, limits and fallback","dataSource":"Ergon Energy Network","dataVersion":"export-constraint-register-2026-08-01","dataConfidence":"High","evidenceUrl":"https://www.ergon.com.au/network/our-services/connections/residential-and-commercial-connections/solar-connections-and-other-technologies/dynamic-connections-for-energy-exports/about-dynamic-connections","retrievedAt":"2026-08-01T00:00:00+00:00"},{"regimeKey":"au-sa-sapn-flexible-residential","networkCode":"SAPN","networkName":"SA Power Networks","jurisdictionCode":"AU-SA","jurisdictionName":"South Australia","marketCode":"NEM-SA1","connectionClass":"New or upgrading residential solar","regimeType":"flexible","status":"active","availability":"Standard connection option across the distribution network, subject to site capability.","effectiveFrom":null,"effectiveTo":null,"minimumExportKw":null,"maximumExportKw":10,"staticFallbackKw":1.5,"limitBasis":"per-phase","emergencyOverride":true,"communicationsStandard":"Dynamic export capable internet-connected inverter or gateway","equipmentRequirement":"Compatible inverter, site-wide export control and maintained internet connection.","eligibility":"New or upgrading solar customers; existing customers require compatible equipment and a connection change.","decisionNote":"The 10 kW figure is a ceiling, not a guaranteed export level. Local capacity and emergency controls can reduce it.","sourceKey":"sapn-flexible-exports","sourceLabel":"SA Power Networks Flexible Exports","sourceVersion":"source checked 2026-08-01","sourceLocator":"Customer FAQ: access, fixed alternative, internet fallback and export ceiling","dataSource":"SA Power Networks","dataVersion":"export-constraint-register-2026-08-01","dataConfidence":"High","evidenceUrl":"https://www.sapowernetworks.com.au/your-power/your-energy-choices-add-up/flexible-exports/","retrievedAt":"2026-08-01T00:00:00+00:00"},{"regimeKey":"au-vic-ausnet-flexible-constrained-residential","networkCode":"AUSNET","networkName":"AusNet","jurisdictionCode":"AU-VIC","jurisdictionName":"Victoria","marketCode":"NEM-VIC1","connectionClass":"Eligible constrained residential solar customers","regimeType":"flexible","status":"limited-rollout","availability":"Limited to eligible customers who would otherwise receive no more than 1.5 kW fixed export per phase.","effectiveFrom":null,"effectiveTo":null,"minimumExportKw":null,"maximumExportKw":5,"staticFallbackKw":null,"limitBasis":"per-phase","emergencyOverride":true,"communicationsStandard":"Internet-connected smart inverter","equipmentRequirement":"Compatible equipment and an eligible flexible export connection offer.","eligibility":"Residential customers in constrained locations identified through the connection process.","decisionNote":"This is not yet a universal AusNet offer. Eligibility and the available annual capacity remain location-specific.","sourceKey":"ausnet-flexible-exports","sourceLabel":"AusNet Flexible Exports","sourceVersion":"source checked 2026-08-01","sourceLocator":"Offer summary: eligible customer class, 1.5 kW comparator and 5 kW ceiling","dataSource":"AusNet","dataVersion":"export-constraint-register-2026-08-01","dataConfidence":"High","evidenceUrl":"https://www.ausnetservices.com.au/projects-and-innovation/innovation/flexible-exports","retrievedAt":"2026-08-01T00:00:00+00:00"},{"regimeKey":"au-vic-citipower-flexible-zero-offer","networkCode":"CITIPOWER","networkName":"CitiPower","jurisdictionCode":"AU-VIC","jurisdictionName":"Victoria","marketCode":"NEM-VIC1","connectionClass":"Eligible homes and businesses receiving a 0 kW pre-approved export limit","regimeType":"flexible","status":"limited-rollout","availability":"First-phase offer for eligible customers under the Model Standing Offer.","effectiveFrom":"2026-07-01","effectiveTo":null,"minimumExportKw":null,"maximumExportKw":10,"staticFallbackKw":0,"limitBasis":"site","emergencyOverride":true,"communicationsStandard":"CSIP-Aus","equipmentRequirement":"Compatible inverter, internet connection and successful commissioning.","eligibility":"Customers whose pre-approval returns a 0 kW export limit and who meet the first-phase offer conditions.","decisionNote":"The 10 kW site ceiling is available most of the time in the trial evidence, but real-time network capacity can reduce exports.","sourceKey":"cppal-flexible-exports","sourceLabel":"CitiPower and Powercor Flexible Exports","sourceVersion":"first phase from 2026-07-01; source checked 2026-08-01","sourceLocator":"Flexible exports launch: eligible cohort, connection alternative, ceiling and communications requirement","dataSource":"CitiPower and Powercor","dataVersion":"export-constraint-register-2026-08-01","dataConfidence":"High","evidenceUrl":"https://www.powercor.com.au/network-planning-and-projects/network-innovation/flexible-exports/","retrievedAt":"2026-08-01T00:00:00+00:00"},{"regimeKey":"au-vic-powercor-flexible-zero-offer","networkCode":"POWERCOR","networkName":"Powercor","jurisdictionCode":"AU-VIC","jurisdictionName":"Victoria","marketCode":"NEM-VIC1","connectionClass":"Eligible homes and businesses receiving a 0 kW pre-approved export limit","regimeType":"flexible","status":"limited-rollout","availability":"First-phase offer for eligible customers under the Model Standing Offer.","effectiveFrom":"2026-07-01","effectiveTo":null,"minimumExportKw":null,"maximumExportKw":10,"staticFallbackKw":0,"limitBasis":"site","emergencyOverride":true,"communicationsStandard":"CSIP-Aus","equipmentRequirement":"Compatible inverter, internet connection and successful commissioning.","eligibility":"Customers whose pre-approval returns a 0 kW export limit and who meet the first-phase offer conditions.","decisionNote":"The 10 kW site ceiling is available most of the time in the trial evidence, but real-time network capacity can reduce exports.","sourceKey":"cppal-flexible-exports","sourceLabel":"CitiPower and Powercor Flexible Exports","sourceVersion":"first phase from 2026-07-01; source checked 2026-08-01","sourceLocator":"Flexible exports launch: eligible cohort, connection alternative, ceiling and communications requirement","dataSource":"CitiPower and Powercor","dataVersion":"export-constraint-register-2026-08-01","dataConfidence":"High","evidenceUrl":"https://www.powercor.com.au/network-planning-and-projects/network-innovation/flexible-exports/","retrievedAt":"2026-08-01T00:00:00+00:00"},{"regimeKey":"au-wa-western-power-advanced-der-doe","networkCode":"WESTERN-POWER","networkName":"Western Power","jurisdictionCode":"AU-WA","jurisdictionName":"Western Australia","marketCode":"AU-WEM","connectionClass":"Basic embedded generation under an Advanced DER Management product","regimeType":"dynamic-operating-envelope","status":"active","availability":"Available through a retailer off-take arrangement and Dynamic Connection Agreement, such as a VPP product.","effectiveFrom":null,"effectiveTo":null,"minimumExportKw":null,"maximumExportKw":null,"staticFallbackKw":1.5,"limitBasis":"connection-specific","emergencyOverride":true,"communicationsStandard":"Dynamic Operating Envelope under Advanced DER Management","equipmentRequirement":"Compatible managed DER, retailer product and dynamic connection agreement.","eligibility":"Customers participating through a qualifying retailer Advanced DER Management product.","decisionNote":"No universal dynamic ceiling is published in the source. The permitted export remains bounded by the connection-specific operating envelope.","sourceKey":"western-power-basic-eg-2026","sourceLabel":"Western Power Basic EG Connection Technical Requirements","sourceVersion":"2026 edition; source checked 2026-08-01","sourceLocator":"Section 4.3.1.1 and 4.3.3","dataSource":"Western Power","dataVersion":"export-constraint-register-2026-08-01","dataConfidence":"High","evidenceUrl":"https://www.westernpower.com.au/48fbec/siteassets/documents/manuals-guides-and-standards/basic-embedded-generation-connection-requirements/basic-eg-connection-technical-requirements-2026.pdf","retrievedAt":"2026-08-01T00:00:00+00:00"},{"regimeKey":"au-wa-western-power-basic-eg-large-network-single-phase","networkCode":"WESTERN-POWER","networkName":"Western Power","jurisdictionCode":"AU-WA","jurisdictionName":"Western Australia","marketCode":"AU-WEM","connectionClass":"Single-phase basic embedded generation on the large network","regimeType":"fixed","status":"active","availability":"Published technical requirement; the applicable connection and retailer off-take agreement determine the permitted setting.","effectiveFrom":null,"effectiveTo":null,"minimumExportKw":null,"maximumExportKw":5,"staticFallbackKw":1.5,"limitBasis":"site","emergencyOverride":true,"communicationsStandard":"AS/NZS 4777 export limit control","equipmentRequirement":"Compliant export control where the approved export is below inverter capacity.","eligibility":"Large-network basic embedded generation; without a retailer off-take agreement the setting is no more than 1.5 kW.","decisionNote":"This narrow row must not be generalized to small networks, shared connections, three-phase sites or systems above the basic EG class.","sourceKey":"western-power-basic-eg-2026","sourceLabel":"Western Power Basic EG Connection Technical Requirements","sourceVersion":"2026 edition; source checked 2026-08-01","sourceLocator":"Section 4.3.1 and Table 4.1","dataSource":"Western Power","dataVersion":"export-constraint-register-2026-08-01","dataConfidence":"High","evidenceUrl":"https://www.westernpower.com.au/48fbec/siteassets/documents/manuals-guides-and-standards/basic-embedded-generation-connection-requirements/basic-eg-connection-technical-requirements-2026.pdf","retrievedAt":"2026-08-01T00:00:00+00:00"}],"sources":[{"sourceKey":"ausnet-flexible-exports","title":"Flexible Exports","publisher":"AusNet","url":"https://www.ausnetservices.com.au/projects-and-innovation/innovation/flexible-exports","monitorUrl":"https://www.ausnetservices.com.au/projects-and-innovation/innovation/flexible-exports","retrievalMode":"direct","sourceKind":"html","networkCodes":["AUSNET"],"cadence":"monthly","monitorStatus":"current","contentHash":"036fe1b55f73835f194b6da0385811088507e76ff15a9d56ea975357eb73bbcd","lastCheckedAt":"2026-08-02T04:01:09.547+00:00","lastChangedAt":null,"dataVersion":"source-check-2026-08-02-036fe1b55f73"},{"sourceKey":"cppal-flexible-exports","title":"Flexible exports","publisher":"CitiPower and Powercor","url":"https://www.powercor.com.au/network-planning-and-projects/network-innovation/flexible-exports/","monitorUrl":"https://www.powercor.com.au/network-planning-and-projects/network-innovation/flexible-exports/","retrievalMode":"direct","sourceKind":"html","networkCodes":["CITIPOWER","POWERCOR"],"cadence":"monthly","monitorStatus":"current","contentHash":"b525ca04c7e5cef61db161b83d23ac9ff6cb56d080e3241c1feb7ea68b2d9cad","lastCheckedAt":"2026-08-02T04:01:12.743+00:00","lastChangedAt":null,"dataVersion":"source-check-2026-08-02-b525ca04c7e5"},{"sourceKey":"energex-dynamic-connections","title":"Dynamic Connections for energy exports","publisher":"Energex","url":"https://www.energex.com.au/our-services/connections/residential-and-commercial-connections/solar-connections-and-other-technologies/dynamic-connections-for-energy-exports/homeowners-and-small-business","monitorUrl":"https://r.jina.ai/http://www.energex.com.au/our-services/connections/residential-and-commercial-connections/solar-connections-and-other-technologies/dynamic-connections-for-energy-exports/homeowners-and-small-business","retrievalMode":"reader-proxy","sourceKind":"html","networkCodes":["ENERGEX"],"cadence":"monthly","monitorStatus":"current","contentHash":"df32a53f9a8f68d3ff59d5beeef162c510779760928d4ec2f10ec9de1d19ecb3","lastCheckedAt":"2026-08-02T04:01:03.438+00:00","lastChangedAt":null,"dataVersion":"source-check-2026-08-02-df32a53f9a8f"},{"sourceKey":"ergon-dynamic-connections","title":"About Dynamic Connections","publisher":"Ergon Energy Network","url":"https://www.ergon.com.au/network/our-services/connections/residential-and-commercial-connections/solar-connections-and-other-technologies/dynamic-connections-for-energy-exports/about-dynamic-connections","monitorUrl":"https://r.jina.ai/http://www.ergon.com.au/network/our-services/connections/residential-and-commercial-connections/solar-connections-and-other-technologies/dynamic-connections-for-energy-exports/about-dynamic-connections","retrievalMode":"reader-proxy","sourceKind":"html","networkCodes":["ERGON"],"cadence":"monthly","monitorStatus":"review-required","contentHash":"8014146adde21d096763bb51c4de045b8144bf2e8bcfc4887e48f52016c7c866","lastCheckedAt":"2026-08-02T04:01:07.225+00:00","lastChangedAt":null,"dataVersion":"source-check-2026-08-02-8014146adde2"},{"sourceKey":"sapn-flexible-exports","title":"Flexible Exports","publisher":"SA Power Networks","url":"https://www.sapowernetworks.com.au/your-power/your-energy-choices-add-up/flexible-exports/","monitorUrl":"https://www.sapowernetworks.com.au/your-power/your-energy-choices-add-up/flexible-exports/","retrievalMode":"direct","sourceKind":"html","networkCodes":["SAPN"],"cadence":"monthly","monitorStatus":"current","contentHash":"3d552581eef55e34e085bf3129a2555c6e75c4fe53da5d874098c036bc5ca9f6","lastCheckedAt":"2026-08-02T04:01:02.475+00:00","lastChangedAt":null,"dataVersion":"source-check-2026-08-02-3d552581eef5"},{"sourceKey":"western-power-basic-eg-2026","title":"Basic Embedded Generator Connection Technical Requirements","publisher":"Western Power","url":"https://www.westernpower.com.au/48fbec/siteassets/documents/manuals-guides-and-standards/basic-embedded-generation-connection-requirements/basic-eg-connection-technical-requirements-2026.pdf","monitorUrl":"https://www.westernpower.com.au/48fbec/siteassets/documents/manuals-guides-and-standards/basic-embedded-generation-connection-requirements/basic-eg-connection-technical-requirements-2026.pdf","retrievalMode":"direct","sourceKind":"pdf","networkCodes":["WESTERN-POWER"],"cadence":"monthly","monitorStatus":"current","contentHash":"7b35fc4b2be4012474e705a76324dd8ea46d1cc8ead44ed3f9e87d33df2ed679","lastCheckedAt":"2026-08-02T04:01:14.421+00:00","lastChangedAt":null,"dataVersion":"source-check-2026-08-02-7b35fc4b2be4"}],"events":[],"filters":{"jurisdiction":null,"network":null,"type":null}}